GIS Substation Testing Trolley is used to test the entire GIS substation with phantom loading. The trolley consists of a Primary current injection kit, a High Voltage kit, and a phase shifting transformer. The unit is divided into two parts one is the control area and the other is the power source area. In the control area sitting arrangements is there for two persons with air conditioning. Entry point in both the areas is separate. There is an access point from control area to power source area. The trolley is fitted with all the accessories for standard operation.

  • Up to 400kV of GIS substation can be tested.
  • Compact Design and technologically advanced design that helped make proper use of space and minimize the size of the equipment.
  • The equipment has been made in such a way so that it is very simple to operate, thus any person after learning once can operate it.
  • To ensure better life and for transformer winding, perfect working condition of the transformer, special insulating paper used.
  • Equipment is covered under one year warranty and is valid against manufacturing defects but not against normal wear and tear, breakage, burning, fusing, damages due to incoming power supply, improper handling, consequential and in-transit.
Parameter Description
1 Input Voltage 433V 50HZ / 60HZ AC Supply
2 Auxliary Voltage 400V 3 Phase
3 Division of Complete Unit
4(i) Control Panel Power Source
All the controls for Primary Injection, High Voltage and Phase Shifting Transformer Main Transformer for primary current injection Test Set – Up to 1000A and Open Circuit Voltage of 440V or as required
For Primary Current Injection Amperemeter,Line on indicator, Main On/Off Switch for Primary Current Testing. Auto Transformer – 250 Amp Single Phase Motorised Oil Cooled 3 Nos.or as required.
For High Voltage Input ON/OFF switch, Input ‘ON’ Indicators, HT ON Push Button, HT ON Indicator, Push Buttons to increase/decrease the HT OFF Indicator, H.T Probe Set with H.T cable, KV Meter Digital with VSS,mA Meter Digital with ASS AC High voltage up to 30kV, 200mA or as required.
Phase Shifting transformer up to 200VA with Phase shift of 0-360° adjustable
5 Main Transformer Shall be air cooled type. Primary winding having DCC insulation and secondary winding of bare copper strip. The unit will have provision for forced cooling. The copper busbar shall be of electrolyte grade. The neutral shall also be brought outside.The design of Main Transformer will be such that can generate 1000 Amps. In case of need, each phase can be used independently. The unit shall be consist of primary switch for change from independent control to simultaneous control of all three phases
6 Regulating Transformer Will be Motorised having limit switches.
7 Accessories and Enclosure All the unit shall be housed in MS sheet body supported with angle iron frame. Cables : 5×50 mm 2 with connection clamps or plug, 25m 5x24mm 2 with CEE plug, 25m (120×2) mm 2 with connection clamps length 25m